• Cast-in Channel
    • Hot rolled
    • Cold rolled
  • Products for Precast
    • Lifting System
    • ​Connector System
    • Formwork System
  • Mechanical Splicing Systems
  • Support System
    • Bridge Support BOB
    • System of Diagonal Bracing

Shenzhen Metro Line 8

banner
Shenzhen Metro Line 8
July 24, 2025

Location:Shenzhen, Guangdong
Delivery Time:2022
Products Supplied:Embedded channels for overhead contact lines
Project Overview:The 20.38-km line became operationl in December 2023.


_0030_深圳市城市轨道交通8号线一期工程8132标

Inquiry Now

+86 xxxxxxxxxxx

+86 (0) 53289069211

marketing@anteky.com

Instagram

Facebook