• Cast-in Channel
    • Hot rolled
    • Cold rolled
  • Products for Precast
    • Lifting System
    • ​Connector System
    • Formwork System
  • Mechanical Splicing Systems
  • Support System
    • Bridge Support BOB
    • System of Diagonal Bracing

Shenyang Metro Line 4

banner
Shenyang Metro Line 4
July 24, 2025

Location:Shenyang, Liaoning
Delivery Time:2022
Products Supplied:Embedded channels for overhead contact lines
Project Overview:The 34-km north-south line became  operationl in September 2023.


_0025_沈阳地铁四号线一期工程

Inquiry Now

+86 xxxxxxxxxxx

+86 (0) 53289069211

marketing@anteky.com

Instagram

Facebook