• Cast-in Channel
    • Hot rolled
    • Cold rolled
  • Products for Precast
    • Lifting System
    • ​Connector System
    • Formwork System
  • Mechanical Splicing Systems
  • Support System
    • Bridge Support BOB
    • System of Diagonal Bracing

ANTEKY Supplies G80 Rebar Couplers for the 2GW Onshore Wind Project at Starah Independent Power Plant

banner
ANTEKY Supplies G80 Rebar Couplers for the 2GW Onshore Wind Project at Starah Independent Power Plant
April 30, 2026

Project Overview:

ANTEKY provided various models of G80 Rebar Couplers for over 100 wind towers in the 2GW Onshore Wind Project at Starah Independent Power Plant. Located in [Riyadh], this is one of the largest and most advanced wind power projects in the world, aiming to promote renewable energy and contribute to the transformation of the local energy structure.

The application of ANTEKY's G80 Rebar Couplers ensures the stability and durability of the wind tower structures. As an essential component in the wind power sector, the couplers effectively connect the rebar and withstand long-term wind and environmental challenges, ensuring the turbines' stable operation in harsh conditions.

Project Significance:

The Starah Independent Power Plant's 2GW Onshore Wind Project is one of the largest wind power construction projects globally. Its completion will significantly promote the local production of green energy and contribute to the global energy transition. As one of the key suppliers to this project, ANTEKY plays an active role in the global wind power sector and supports sustainable development.


8266c7e4-8e5e-4847-8d8d-136b5bb9ce13


Inquiry Now

+86 (0) 53289069211

marketing@anteky.com

Instagram

Facebook