• Cast-in Channel
    • Hot rolled
    • Cold rolled
  • Products for Precast
    • Lifting System
    • ​Connector System
    • Formwork System
  • Mechanical Splicing Systems
  • Support System
    • Bridge Support BOB
    • System of Diagonal Bracing

Fangchenggang Nuclear Power Plant Project

banner
Fangchenggang Nuclear Power Plant Project
May 26, 2026

Anteky has successfully secured the supply contract for precast accessories for the Fangchenggang Nuclear Power Plant Project. As one of the key nuclear power bases along China’s southwest coast, the project plays an important role in enhancing regional clean energy supply, promoting energy structure upgrades, and supporting sustainable green development.

 

During the project construction, Anteky provides high-quality prefabricated component solutions designed for demanding engineering applications. With strong structural stability, excellent installation compatibility, and long-term reliability, the products help improve construction efficiency and on-site coordination, supporting the safe and organized development of the nuclear power project.

 

Backed by extensive experience in large-scale infrastructure projects, Anteky will continue delivering professional products and high-standard services for nuclear power and major infrastructure construction worldwide.

Inquiry Now

+86 (0) 53289069211

marketing@anteky.com

Instagram

Facebook